Skip to main content

Players list Checked In sorting does not change order

Source: Featurebase post 6a20b0d898f1621c6455b383 (Sorting by "Checked In") from Game H / gamehavenmd@gmail.com, 1 upvote.

User report: "This option doesnt actually work. Every time i click it, nothing changes."

PM triage:

  • Problem: event organizers appear to have a Checked In sort option in the player/registration list, but using it does not visibly reorder the list.
  • Evidence: one Featurebase report; no event ID, page URL, browser, or screenshot yet.
  • Current workaround: manually scan the list instead of sorting by check-in state.
  • 90/10: make the existing Checked In sort control reorder deterministically by check-in status without breaking the existing player list behavior.

Needs reproduction details before backlog acceptance:

  • Event link/ID and game/program.
  • Exact page/table where the sort is clicked.
  • Expected order vs actual order, with screenshot or short recording if possible.

Log in to comment and vote

No comments yet

Be the first to share your thoughts.